Page 11
Ward: Cupar
Application Determined
14/03510/FULL | Erection of 500 kW wind turbine (79m to blade tip), formation of access track and associated infrastructure | Muirhead Farm Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NDR3KDHFIUT00
Application Refused

Page 21
Ward: east Neuk And Landward
Application Determined
14/03798/FULL | Erection of single 225 kw wind turbine (48.01 metres to blade tip) and ancillary works | Muirhead Farm Muirhead Crail Anstruther Fife KY10 3XE
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NF8VEQHFJCV00
Application Permitted With Conditions

Page 21
Ward: east Neuk And Landward
Application Determined
15/00767/SCR | Screening opinion for erection of a single 225kW wind turbine (tower height of 32.2m, blade diameter of 27m, overall tip height 45.7m) SITE; Leys Farm, near Crail, KY10 3XE | Leys Farm Lochton Crail Anstruther Fife KY10 3XD
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NKOYBPHF0O100
EIA Not Required

Page 21
Ward: east Neuk And Landward
Application Determined
15/01055/SCR | Screening opinion for erection of a single wind turbine (Overall height to blade tip 77m) SITE; Belliston Quarry, by Arncroach, Pittenweem | Belliston Quarry Gibliston Colinsburgh Leven Fife KY9 1JS
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NLRFFSHF0O100
EIA Not Required

Download Full List: Weekly Update of Development Applications 2015-05-18-02-29-40

Load More Related Articles
Load More By Loch of Shining Waters
Load More In Public Services

Leave a Reply

All fields are optional. You do not have to use your real name, pseudonyms are accepted.

Check Also

Rockgelly seeks your views!

The long awaited Rockgelly project is nearer completion and the organisers are seeking the…