Page 11
Ward: Cupar
Application Determined
14/03510/FULL | Erection of 500 kW wind turbine (79m to blade tip), formation of access track and associated infrastructure | Muirhead Farm Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NDR3KDHFIUT00
Application Refused

Page 21
Ward: east Neuk And Landward
Application Determined
14/03798/FULL | Erection of single 225 kw wind turbine (48.01 metres to blade tip) and ancillary works | Muirhead Farm Muirhead Crail Anstruther Fife KY10 3XE
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NF8VEQHFJCV00
Application Permitted With Conditions

Page 21
Ward: east Neuk And Landward
Application Determined
15/00767/SCR | Screening opinion for erection of a single 225kW wind turbine (tower height of 32.2m, blade diameter of 27m, overall tip height 45.7m) SITE; Leys Farm, near Crail, KY10 3XE | Leys Farm Lochton Crail Anstruther Fife KY10 3XD
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NKOYBPHF0O100
EIA Not Required

Page 21
Ward: east Neuk And Landward
Application Determined
15/01055/SCR | Screening opinion for erection of a single wind turbine (Overall height to blade tip 77m) SITE; Belliston Quarry, by Arncroach, Pittenweem | Belliston Quarry Gibliston Colinsburgh Leven Fife KY9 1JS
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NLRFFSHF0O100
EIA Not Required

Download Full List: Weekly Update of Development Applications 2015-05-18-02-29-40

Load More Related Articles
Load More By Loch of Shining Waters
Load More In Public Services

Leave a Reply

All fields are optional. You do not have to use your real name, pseudonyms are accepted.

Check Also

Shell – Community Notice – Planned Maintenance for 3rd July 2018

Posted on behalf of Shell Wednesday 27 June, 2018 Dear community colleagues, I would like …