Page 9
Ward: Cupar
Application Registered
15/01412/SCR | Screening opinion for solar array | Rankeilour Estate Rankeilour Bow Of Fife Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=documents&keyVal=NN5YHPHF0UX00

Page 16
Ward: East Neuk And Landward
Application Registered
15/00538/FULL | Installation of solar farm (5 MW) and associated development including erection of sub-station and security fencing and formation of vehicular access | Cameron Reservoir Cameron Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NJWX9OHFKUM00

Page19
Ward: Glenrothes North, Leslie And Markinch
Application Registered
15/00769/FULL | Erection of 500 kW wind turbine (maximum of 77 metres to blade tip) and 50 metre high meteorological mast with associated access track, wind turbine foundation, crane hardstanding, substation/kiosk with switchgear, control and metering equipment, ancillary infrastructure and temporary ground works | Land To The East Of Hilton Of Kirkforthar Rameldry Kettlebridge Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NKP1VZHFL5Y00

Page 20
Ward: Glenrothes North, Leslie And Markinch
Application Registered
15/00768/FULL | Erection of 500kW wind turbine (102 metres to blade tip) and 50 metre high meteorological mast with associated access track, wind turbine foundation, crane hardstanding, substation/kiosk with switchgear, control and metering equipment, ancillary infrastructure and temporary ground works | Land South Of Dalginch Farm Newton Star Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NKP1U7HFL5W00

Page 23
Ward:Howe Of Fife And Tay Coast
Application Registetred
15/01258/FULL | Erection of 100 kW wind turbine (48.8m to blade tip) with associated infrastructure | Forthar Farm Forthar Kettlebridge Cupar Fife KY15 7TX
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NMQNYOHFT8000

Page 40
Ward: Tay Bridgehead
Application Registered
15/00545/FULL | Installation of a 5MW Solar Farm and associated development | Land To The West Of Kirkton Barns Farm Tayport Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NJX1H9HFKV400

Download Weekly Planning List: Weekly Update of Development Applications 2015-04-27-03-00-48

Load More Related Articles
Load More By Loch of Shining Waters
Load More In Public Services

Leave a Reply

All fields are optional. You do not have to use your real name, pseudonyms are accepted.

Check Also

Is this how Stagecoach teach their drivers to do!

Not only stopping so blocking a pelican crossing but see how close the bus is to the car i…