Ward: East Neuk And Landward
Application Determined
15/00301/SCR | EIA Screening for Installation of solar farm (6.5 MW capacity) [Site Address: Land adjacent to Sypsies plantation, Crail] | Land To The North West Of Farmhouse Sypsies Sypsies Crail Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=documents&keyVal=NIVYGBHF0UX00
EIA Not Required

Page17
Ward: Glenrothes North, Leslie And Markinch
Application Registered
15/00773/FULL | Erection of 500 kW wind turbine (maximum of 102 metres to blade tip) and 50 metre high meteorological mast with associated access track, wind turbine foundation, crane hardstanding, substation/kiosk with switchgear, control and metering equipment, ancillary infrastructure and temporary ground works | Land East Of Kirkforthar Feus Quarry Kirkforthar Feus Kirkforthar Glenrothes Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NKP501HFT8000

Page 30
Ward: Lochgelly And Cardenden
Application Determined
15/01059/SCR | Screening opinion for erection of a single wind turbine (Overall height to blade tip 102m) | Birchwood Sidings Cluny Fife
http://planning.fife.gov.uk/online/applicationDetails.do?activeTab=summary&keyVal=NLRHG8HF0O100
Application Withdrawn

Download Full Planning List: Weekly Update of Development Applications 2015-04-20-03-32-09

Load More Related Articles
Load More By Loch of Shining Waters
Load More In Public Services

Leave a Reply

All fields are optional. You do not have to use your real name, pseudonyms are accepted.

Check Also

Is this how Stagecoach teach their drivers to do!

Not only stopping so blocking a pelican crossing but see how close the bus is to the car i…