Page 16
Ward: East Neuk And Landward
Application Registered
15/00176/SCR | Screening opinion for erection of 2 x 85kW wind turbines (36.6m to blade tip) | Bonnytown Farm Bonnytown Dunino St Andrews Fife KY16 8LS
Page 17
Ward: East Neuk And Landward
Application Determined
15/00176/SCR | Screening opinion for erection of 2 x 85kW wind turbines (36.6m to blade tip) | Bonnytown Farm Bonnytown Dunino St Andrews Fife KY16 8LS
EIA Not Required
Page 24
Ward: Howe Of Fife And Tay Coast
Application Determined
15/00108/SCR | Screening opinion for erection of a single 225kW wind turbine (tower height of 40m, blade diameter of 29.1m) | Bowhouse W W T W Lathrisk Freuchie Cupar Fife KY14 7ES
 
Page 27
Ward: The Lochs
Application Registered
15/00243/SCO | Scoping opinion for erection of four 180kW wind turbines (combined 720kW) (Overall height of 48m with maximum hub height of 30.5m) | Land South Of Lochore Meadows Country Park And Land At Glencraig Kelty Fife
Page 38
Ward: West Fife And Coastal Villages
Application Registered
15/00245/SCO | Scoping opinion for erection of two 500kW wind turbines (combined 1MW) (Overall height of 86.5m with maximum hub height of 60m) (Site – Blairhall Former Bing, West) | Land 500M South Of East Grange Farmhouse Shiresmill Blairhall Fife
Load More Related Articles
Load More By Loch of Shining Waters
Load More In Public Services

Leave a Reply

All fields are optional. You do not have to use your real name, pseudonyms are accepted.

Check Also

Shell – Community Notice – Planned Maintenance for 3rd July 2018

Posted on behalf of Shell Wednesday 27 June, 2018 Dear community colleagues, I would like …